BEAM CLAMPS
BEAM CLAMPS are used on the beam supports, and can be removed within 52 hours of concreting. Beam clamps are suitable for use with steel timber shuttering.
FOR FAST. ACCURATE AND RIGID CLAMPING OF BEAM FORMWORK AND CASTINGS !
The fastest method of clamping beam form work and castings
Simple to adjust and lock.
Interchangeable arms ensure maximum versatility
The slot arrangement allows for simple, speedy and accurate adjustment to any dimension within the size range
Longer base tubes of ordinary scaffold tube can be used of extra wide beams.
Can be used with both steel & timber shuttering
Robust, light weight construction.
Spigots provided for positive location in prop heads
Nail holes in arms.
No loose parts.
No tools required
Easily dismantled for compact storage and transport

